COVID-19 update: Customers may experience some delays with planning, building and development enquiries and applications. We are working to minimise changes where possible, and thank you for your patience and understanding during this time. For building or development queries please email [email protected] or call our Customer Service Centre on 131 722.

Trenches and shafts - backfill and surface

 

Location​

Freeways and arterial roads​

Other roads pavements​

Footpath, other paved areas, adjacent to structures​

Nature strips, lawns, road reserve clear of pavement​

​ Elsewhere​

Surface course​

Temporary repair - 7 mm cold asphalt, permanent repair - as specified by controlling authority for pavement​

Material type to match original​

Restore to the requirements of the local municipal council. Topsoil and seed grassed areas​

​ Restore to the requirements of the local municipal council. Topsoil and seed grassed areas​

Backfill

Method designation

A1 - 1​

A1 - 1​

A2 - 1

A5 - 2 

 B1 - 2​

B2 - 2​

B3 - 2​

Upper (from 600 mm below surface course)

20 mm VicRoads class 2 crushed rock

Compacted to >98% MDD

20 mm VicRoads class 2 crushed rock

Compacted to >98% MDD

20 mm VicRoads class 3 crushed rock or A Grade sand

Compacted to > 98%

Selected excavated material

Compacted to >95% MDD

Ordinary excavated material

Compacted to > 95% MDD

Bulk excavated material

Compacted to > 95% MDD

Method designation

A1 - 1​

A3 - 1 or A5 - 2​

A2 - 1 or A5 - 2​

B1 - 2​

B2 - 2​

B3 - 2​

Lower (from 300 mm above pipe to 600 mm below surface)

20 mm VicRoads class 2 crushed rock

Compacted to >98% MDD

20 mm VicRoads class 2 crushed rock

Compacted to >98% MDD

20 mm VicRoads class 3 crushed rock or A Grade sand

Compacted to >98% MDD

Ordinary excavated material

Compacted to > 95% MDD

Ordinary excavated material

Compacted to > 95% MDD

Bulk excavated material

Compacted to > 95% MDD

 

 

 