M22-M46 Mitcham to Syndal water mains renewal
We’re replacing three ageing sections of the M22 and M46 water mains between Mitcham and Syndal.
We’re replacing three ageing sections of the M22 and M46 water mains between Mitcham and Syndal.
Melbourne Water is removing the infestation of ‘giant pine scale’ from Cardinia Reservoir and replanting the affected areas with native plants. These works will protect the local environment from further damage from giant pine scale and ensure the long-term biodiversity of the area.
We’re working to remove an infestation of water weed (water hyacinth) discovered on our land within Namatjira Park.
We’re upgrading Liverpool Road retarding basin in Boronia, to ensure a safe drainage system and prevent surrounding homes from flooding.
We’re undertaking modification works to strengthen and extend the life of the Blind Creek footbridge in Fairpark Reserve.
The Hallam Valley wetlands require some minor works to improve how the wetland functions. For safety, the wetlands are closed to community access until mid 2024.
We’re undertaking a four-year program of weed control and revegetation works to improve the condition of native vegetation along Malcolm Creek in Mount Ridley Nature Conservation Reserve.
Upgraded the electrical and control equipment of the pump station along the Yarra River opposite the entrance to Crown Casino on Southbank Boulevard. During storm events the pumps allow a faster rate of flow for water into the river when the drains are at capacity.
We’re installing a new pressure reducing valve in the St Helena pipe-track, located off St Helena Road, St Helena.
In Melbourne, water is essential to our way of life. Today, clean, affordable water is readily available to our homes and businesses whenever we need it. Running from Beaconsfield to Langwarrin, the M418 water main is integral to the water supply for the Mornington Peninsula area. The main consists of divide and air valves to allow for outages, maintenance works and functionality. We’re conducting improvement works to ensure it continues to operate efficiently throughout the Cranbourne community, today, tomorrow and for generations to come.