Introduction to WSUD
Stormwater is rainwater that has fallen onto roads or roofs and often contains chemicals or pollutants.
Stormwater is rainwater that has fallen onto roads or roofs and often contains chemicals or pollutants.
Clause 56.07-4 of the Victorian Planning Provisions, commonly referred to as Clause 56, sets stormwater management objectives that residential subdivisions must meet. These objectives are designed to reduce the harm to our waterways, bays and ocean.
These plans outline how we operate, maintain and ensure the safety of our electrical assets.
The Network Outlook dashboard is an interactive tool that shows how our water and sewerage networks might perform under a variety of future scenarios – helping future-proof the infrastructure upon which we rely.
A Work Permit is required if a contractor needs to enter confined space on an existing Melbourne Water asset, such as a live pipeline or pit structure.
Overview of conditions including liability, insurance, material damage and Workcover.
A Certificate of Completion will be issued by us when all the requirements of the agreement have been satisfied.
The requirements (if applicable), include:
We're responsible for the operation and maintenance of the Works and associated costs from the date of the Certificate of Completion, except where costs are incurred as a re