Indemnity and insurance conditions 3.12
Overview of conditions including liability, insurance, material damage and Workcover.
Overview of conditions including liability, insurance, material damage and Workcover.
The contractor must only use materials approved by, and to the limitations set by us.
Specifications for excavation work
Laying, jointing and embedment of pipes must be done in accordance with the following relevant standards, drawings and this specification.
How to backfill the excavation
Placement of backfill is as defined and designated in this section.
The contractor must excavate, supply materials and construct all manholes in accordance with the Drawings, subject to the tolerances specified in Tolerances. N25 Grade concrete must be used, unless otherwise shown on the drawings.