Melbourne Water Work Permit 3.11
A Work Permit is required if a contractor needs to enter confined space on an existing Melbourne Water asset, such as a live pipeline or pit structure.
A Work Permit is required if a contractor needs to enter confined space on an existing Melbourne Water asset, such as a live pipeline or pit structure.
Overview of conditions including liability, insurance, material damage and Workcover.
A Certificate of Completion will be issued by us when all the requirements of the agreement have been satisfied.
The requirements (if applicable), include:
We're responsible for the operation and maintenance of the Works and associated costs from the date of the Certificate of Completion, except where costs are incurred as a re
When a developer is designing and constructing one of our wetlands or retarding basins, often we and the local council are expected to have joint maintenance responsibilities wit
We have over 60 standard drawings to help with your development. We also have guidelines to help you identify the minimum requirements to be completed when submitting a range of applications to us.
Use our checklists and statement templates to provide us with the right information in your application or to guide development steps.
Download a variety of previous standard or concept drawings to assist with your proposed development.