Levee banks
'As constructed' information of levee banks is relatively easy due to the accessibility.
'As constructed' information of levee banks is relatively easy due to the accessibility.
The 'as constructed' information for all pipelines/structures and channels relating to retarding basins and wetlands, or retarding basin walls (levee banks), must be provided.
Pipelines and structures standards and specifications for works surveying.
View our requirements for preparing drawings for work surveying, including connection to title boundaries and digital survey data.
The Subdivisional Servicing policy describes the general waterway, water quality and drainage works that must be incorporated into servicing of new land developments.
When creating plans of subdivision, you must provide roads, drainage reserves/easements and necessary drainage works.
The use of easements and reserves to protect our assets will be influenced by the type of asset, long term statutory responsibilities, implied rights and required control over use of the land.
This policy describes the scope of planning permit conditions that we request in response to planning applications referred to us under the Planning and Environment Act 1987, and planning schemes.
Our contributions policy details the owner's contributions for the provision of waterway, water quality treatment and drainage facilities, and the criteria upon which assessment of the amount of the contributions is based.
An owner who’s required to build our assets in conjunction with the development is reimbursed an amount towards the cost of the works by us.