Bentleigh Main Drain Pump Installation
We are installing a new pump to facilitate stormwater flow under the Dandenong-Frankston railway line.
We are installing a new pump to facilitate stormwater flow under the Dandenong-Frankston railway line.
We’re undertaking a four-year program aimed at controlling rapidly-spreading weed species and revegetation with native species along a 2.3km section of Dandenong Creek, from Ferntree Gully Road to Mulgrave Reserve.
We are upgrading meters that help monitor water flowing through our water mains under the St Georges Road median.
We’ve rectified the outlet structure of Thornhill Park retarding basin and wetland, to naturally balance water levels within the system as designed.
Melbourne Water undertakes routine inspections and maintenance of Lilydale Drain and other drainage assets within the local area. To maintain these assets at times maintenance and desilting works are required.
We’re developing a holistic, data-driven approach to prevent litter entering Port Phillip Bay through Elster Creek.
We’re embarking on a major program that will see over 60km of the Birrarung (Yarra River) receive a dedicated renewal over five years from 2022-2026 to help promote the health of our landmark waterway.
We're upgrading 3.5kms of the North Yarra Main Sewer between Yarra Flats Park, Ivanhoe East and Farms Rd, Alphington.
In partnership with Glen Eira City Council, we’ve commissioned several studies into options for mitigating flooding from the Koornang Main Drain, which services the suburbs of Ormond and McKinnon.
We are removing an infestation of giant pine scale from Cardinia Reservoir and replanting the affected areas with native plants. These works will protect the local environment from further damage from giant pine scale and ensure the long-term biodiversity of the catchment.