Surveying - pipelines and structures
Pipelines and structures standards and specifications for works surveying.
Pipelines and structures standards and specifications for works surveying.
View our requirements for preparing drawings for work surveying, including connection to title boundaries and digital survey data.
Who to contact for help getting the right approvals for a building or development permit.
Use this handy index to locate information from the Land Development process.
Find out how to apply best practice stormwater management and use water sensitive urban design (WSUD) in your developments.
Stormwater is rainwater that has fallen onto roads or roofs and often contains chemicals or pollutants.
Clause 56.07-4 of the Victorian Planning Provisions, commonly referred to as Clause 56, sets stormwater management objectives that residential subdivisions must meet. These objectives are designed to reduce the harm to our waterways, bays and ocean.
These plans outline how we operate, maintain and ensure the safety of our electrical assets.
The Network Outlook dashboard is an interactive tool that shows how our water and sewerage networks might perform under a variety of future scenarios – helping future-proof the infrastructure upon which we rely.
A Work Permit is required if a contractor needs to enter confined space on an existing Melbourne Water asset, such as a live pipeline or pit structure.