Network Outlook dashboard
The Network Outlook dashboard is an interactive tool that shows how our water and sewerage networks might perform under a variety of future scenarios – helping future-proof the infrastructure upon which we rely.
The Network Outlook dashboard is an interactive tool that shows how our water and sewerage networks might perform under a variety of future scenarios – helping future-proof the infrastructure upon which we rely.
A Work Permit is required if a contractor needs to enter confined space on an existing Melbourne Water asset, such as a live pipeline or pit structure.
Overview of conditions including liability, insurance, material damage and Workcover.
This section addresses the issues associated with rockwork for the protection of waterways.
View objectives, principles and considerations when planning or carrying out work to protect and rehabilitate waterway health as part of the land development process.
The contractor must only use materials approved by, and to the limitations set by us.
Specifications for excavation work
Laying, jointing and embedment of pipes must be done in accordance with the following relevant standards, drawings and this specification.
How to backfill the excavation