Little Stringybark Creek ESO pre-development advice
The Little Stringybark Creek Environmental Significance Overlay (ESO) has been introduced into the Yarra Ranges Planning Scheme to improve the health and condition of Little Stri
The Little Stringybark Creek Environmental Significance Overlay (ESO) has been introduced into the Yarra Ranges Planning Scheme to improve the health and condition of Little Stri
This service is only to be used by Retail Water Companies. Construction of a property sewer (domestic or industrial) in to Melbourne Water Sewer network.
If you plan to construct a crossing over our drain or waterway or to make any changes to an existing crossing, you must get our approval.
You must have our approval before you start work on any utility installations (such as gas, electricity and water) or excavations near our assets.
If you are planning to perform minor works on waterways you must get our consent.
If you are planning landscaping work we must approve proposed plantings over or near pipe reserves, easements and floodways.
To build a bicycle or pedestrian path on our land, near our assets or within a floodplain you will need our formal approval.
You need our formal approval before you can work on any new or modified stormwater connection.
Inspections are required to ensure that our conditions are met, waterways are protected, public safety ensured, property is protected and works and building complies with standards.
Landowners must apply for our consent to maintain existing levees on Crown land that adjoins a rural property.