Basic page template
Start by summarising the purpose of the page for your intended audience. Lead with a verb, use second-person 'you/your' pronouns, and aim for less than 150 characters or two lines.
Start by summarising the purpose of the page for your intended audience. Lead with a verb, use second-person 'you/your' pronouns, and aim for less than 150 characters or two lines.
Following current Melbourne Water brand guidelines, the existing positive colour version is required to be used in headers/footers.
Following current Melbourne Water brand guidelines, the exiting colour palette will remain the same.
Heading and body typeface is Bliss.
The design must inspire courage, engage, make an impact and show integrity.
This service is only to be used by Retail Water Companies. Construction of a property sewer (domestic or industrial) in to Melbourne Water Sewer network. Connections to Melbourne Water’s sewer mains are provided via a connection point, which must be constructed as per an approved process by Melbourne Water. These type of connections can be requested by any personnel via a relevant retail company.
We are re-coating the Patterson Lakes Tidal Gates with an anti-corrosive paint, protecting them from corrosion so they can continue protecting the community from localised flooding.
Greening the Pipeline is an ambitious project to transform the Main Outfall Sewer reserve (along Federation Trail) into a greener, cooler parkland for communities in Melbourne’s west.
The Little Stringybark Creek Environmental Significance Overlay (ESO) has been introduced into the Yarra Ranges Planning Scheme to improve the health and condition of Little Stringybark Creek in Mt Evelyn.
We're reimagining a number of creeks across Melbourne, transforming them into desirable open spaces where people can interact with nature in cooler, healthier environments.