Design and Construction Hub
Is the new way to lodge Detailed Design Submissions for Civil and Landscaping, through to Final Completion process and handover of assets to the asset owners.
Drainage concept and functional design review and acceptance
Developers designing assets in line with a Development Services Scheme or to alter or decommission an existing Melbourne Water asset must apply for our comments and acceptance of those designs.
Drainage designs go through three stages of review and acceptance:
-
Concept design
-
Functional design
-
Detailed designs submission
Litter management
Like you, we don't like seeing litter being washed off streets into stormwater drains and into our waterways.
Elster Creek Litter Collaboration
We’re developing a holistic, data-driven approach to prevent litter entering Port Phillip Bay through Elster Creek.
Lilydale drainage assets - ongoing maintenance works
Melbourne Water undertakes routine inspections and maintenance of Lilydale Drain and other drainage assets within the local area. To maintain these assets at times maintenance and desilting works are required.
Thornhill Park retarding basin and wetland
We’ve rectified the outlet structure of Thornhill Park retarding basin and wetland, to naturally balance water levels within the system as designed.