Electrical asset management plans
These plans outline how we operate, maintain and ensure the safety of our electrical assets.
These plans outline how we operate, maintain and ensure the safety of our electrical assets.
The Network Outlook dashboard is an interactive tool that shows how our water and sewerage networks might perform under a variety of future scenarios – helping future-proof the infrastructure upon which we rely.
A Work Permit is required if a contractor needs to enter confined space on an existing Melbourne Water asset, such as a live pipeline or pit structure.
Overview of conditions including liability, insurance, material damage and Workcover.
The contractor must only use materials approved by, and to the limitations set by us.
Specifications for excavation work
Laying, jointing and embedment of pipes must be done in accordance with the following relevant standards, drawings and this specification.
How to backfill the excavation