Liverpool Road Retarding Basin Upgrade
We’re upgrading Liverpool Road retarding basin in Boronia, to ensure a safe drainage system and prevent surrounding homes from flooding.
We’re upgrading Liverpool Road retarding basin in Boronia, to ensure a safe drainage system and prevent surrounding homes from flooding.
We’ve completed the modification works to strengthen and extend the life of the Blind Creek footbridge in Fairpark Reserve.
We’re undertaking a four-year program of weed control and revegetation works to improve the condition of native vegetation along Malcolm Creek in Mount Ridley Nature Conservation Reserve.
Upgraded the electrical and control equipment of the pump station along the Yarra River opposite the entrance to Crown Casino on Southbank Boulevard. During storm events the pumps allow a faster rate of flow for water into the river when the drains are at capacity.
We’re installing a new pressure reducing valve in the St Helena pipe-track, located off St Helena Road, St Helena.
In Melbourne, water is essential to our way of life. Today, clean, affordable water is readily available to our homes and businesses whenever we need it. Running from Beaconsfield to Langwarrin, the M418 water main is integral to the water supply for the Mornington Peninsula area. The main consists of divide and air valves to allow for outages, maintenance works and functionality. We’re conducting improvement works to ensure it continues to operate efficiently throughout the Cranbourne community, today, tomorrow and for generations to come.
Melbourne Water updraded the internal fittings of the sewer maintenance hole located at the corner of Cullen Street and Hudsons Road, Spotswood.
Melbourne Water is undertaking water main upgrade works in Melbourne’s eastern and south-eastern suburbs. These upgrade works will ensure Melbourne Water can continue to supply our customers and the wider community with a safe and reliable water supply now and into the future.
In partnership with Glen Eira City Council, we’ve commissioned several studies into options for mitigating flooding from the Koornang Main Drain, which services the suburbs of Ormond and McKinnon.
Melbourne Water undertakes routine inspections and maintenance of Lilydale Drain and other drainage assets within the local area. To maintain these assets at times maintenance and desilting works are required.