To continue our important work of keeping our rivers and creeks healthy, Melbourne Water is upgrading the Lillydale Lake Wetland.

The Lillydale Lake Wetland is a series of shallow, densely planted, man-made ponds that help filter pollutants that wash into our stormwater drains from roads, hard surfaces, parks and gardens. The wetland acts as a natural filtration system that captures pollutants before entering our rivers and oceans.

Why the works are necessary

The Lillydale Lake Wetland is currently not performing to stormwater treatment quality standards. This is due to inadequate vegetation cover as the wetland is too deep for plants to survive. Additionally, water flows from the Olinda Creek are entering the wetland too quickly for its natural filtration process to occur. As a result, the wetland needs to be upgraded to restore it to its original process. 

What do the works involve?

Works to upgrade the wetland will include: 

  • Removing vegetation within the current wetland to enter and exit the site
  • Draining the wetland 
  • Reshaping the base with machinery to correct water depths
  • Mixing lime with sediment to reduce acidity and support new plant growth
  • Modifying the inlet and outlet flows to manage flows from Olinda Creek
  • Revegetating the wetland with new plants to support the filtering of pollutants
  • Removing and stockpiling of wetland sediment

Location of works

Map of Lillydale Lake wetland works, showing project site southeast of lake

Local impact of the works

We will make every effort to minimise the impact of these essential works on the local community and the environment; however during construction you may notice:

  • Temporary closures of the pedestrian board walk and other paths around the wetland
  • Diversions will be in place to safely guide pedestrians around the work site
  • Noise from machinery
  • Dust
  • Increase truck movements
  • Some odour as stockpiled sediment dries out
  • Removal of some vegetation to access the wetland

Timing

Works will start from early November and will take place in two stages: 

  • Stage One will involve draining the wetland and resurfacing the bed of the wetland. This will commence in early November 2019 for eight months.
  • Stage Two will involve revegetating the wetland area, which is expected to take place in late 2020 following the winter season. 

Contact us

We will provide regular updates on the progress of these works. If you would like any further information, please do not hesitate to contact the project team.

Last updated:
12 November 2019