Eumemmerring Creek
Eumemmerring Creek:Poor |
![]() |
||||
| Water quality | Aquatic life | Habitat & stability | Vegetation | Flow | |
|---|---|---|---|---|---|
| Excellent | |||||
| Good | |||||
| Moderate | |||||
| Poor | |||||
| Very Poor | |||||
This is a rural-urban catchment where rapid development is taking place. The creek has been heavily modified in its middle sections to provide flood protection in once extensive wetland areas, as have its upstream tributaries the Hallam Main Drain and Narre Warren and Troups creeks.
Improvement works: Major wetlands have been built, and channel reshaping and replanting works carried out. Replanting will take place in the creek after curves have been put back into the creek from South Gippsland Highway to Abbots Road in Hampton Park.
