If you wish to plant, install, demolish or build over (or near) any of Melbourne Water’s underground assets or easements you need to get our approval – certain fees apply. There are also fees associated with connecting to the stormwater system or Melbourne Water’s drains.
Prices from 1 July 2011 to 30 June 2012
| Application fees | Charge ($) |
|---|---|
| Buildovers | |
| Construction near Melbourne Water easements or underground pipes | 179.00 |
| Stormwater connections (cost per connection) | |
| 1. To open drain or river/creek | 366.00 |
| 2. To underground drain: | |
| 2a. Not in Melbourne Water land | 132.00 |
| 2b. Within a floodway or Melbourne Water land | 366.00 |
| Public/Private works (cost per works/crossings) | |
| Construction of shared paths, pedestrian and road crossings, utility crossings and other type of works that may affect our assets/property. | 366.00 |
| Construction of roads/crossings over water supply pipe track | 1000.00 – 1500.00 |
| Bond and additional costs for all works above | Charge ($) |
| A refundable bond of $5000+ may be payable, as determined by Melbourne Water. | 5000+ |
| Additional costs may be applicable upon approval including inspection fees, land value and valuation costs and legal fees. | |
These fees were reviewed through a public process, where the Essential Services Commission:
- Completed extensive analysis of Melbourne Water’s proposed 2008 Waterways Water Plan. The Waterways Water Plan outlines our long-term goals and targets including specific programs to improve our rivers and creeks and provide a safe level of flood protection for communities.
- Reviewed capital expenditure, operating expenditure and forecast demand.
- Consulted with stakeholders, including a review of submissions made by interested parties.
The 2008 Water Price Review covers a five year regulatory period from 1 July 2008 to 30 June 2013. Prices will increase annually during this period.