Key performance indicators
|
2006/07
|
2007/08
|
||||
Target |
Result |
Target |
Result |
Target met |
|
| Achieve 2006 Waterways and Drainage Operating Charter performance targets (%) | 100 |
94.7
|
100 |
100
|
√
|
| Drainage and flood protection | |||||
|---|---|---|---|---|---|
| All new development complies with flood protection standards (%) |
100 |
100 |
100 |
100 |
√ |
| Planning controls further reduce the number of flood prone properties in redevelopment areas by approximately 250 per year (number) | 250 |
267
|
250 |
450
|
√√ |
| Reduce flood prone properties through expenditure on flood mitigation works (number) | 32 |
36
|
81
|
71
|
X
|
| Stormwater quality | |||||
| Cumulative reduction in pollutant/nitrogen loads in urban stormwater run-off in accordance with the Environment Management Plan for Port Phillip Bay (tonnes) |
37 |
54.5
|
56 |
56.1
|
√
|
| Waterways condition | |||||
| % achievement of three-year implementation targets assigned to Melbourne Water from the Regional River Health Strategy | 100 |
100 |
100 |
100 |
√ |
| Land development | |||||
| Property development applications processed within specified response times (%) | 100 |
100 |
100 |
100 |
√ |
| All new growth areas in development corridors to have drainage schemes in place within three years of significant subdivisional activity commencing (%) | 100 |
100 |
100 |
100 |
√ |
| Create 10 redevelopment schemes per year with priority given to areas of high new development activity (number) | 10 |
14
|
10 |
19
|
√√ |
| Streamflow diversion | |||||
| Number of streamflow diverter licences >5 million litres/yr metered or assessed for metering at 30 June (number) |
640 |
704
|
732 |
797
|
√√
|
√ Target met √√ Target exceeded X Target not met
*Target was not achieved. However, the overall target is to protect 149 vulnerable properties over the three-year Water Plan period since 2005/06. In that time, the number of vulnerable properties protected was 183.
Sustainability Report 2006/07