Key performance indicators
2006/07 |
2007/08 |
||||
Target |
Result |
Target |
Result |
Target met |
|
| Production/storage | |||||
|---|---|---|---|---|---|
| Operate water supply system within environmental requirements (% compliance) |
100 |
99.58 |
100 |
99.58* |
√ |
| Contribute to the Government’s 15% water conservation target (%) |
2.5 |
2.8 |
2.9 |
4.2 |
√ √ |
| Water transfer | |||||
| Reduce system losses as a percentage of water supplied to retail water businesses (%) | 0.76 |
1 |
< 1 |
0.98 |
√ √ |
| Compliance with retail water business pressure requirements as set out in the Bulk Water Service Agreements (BWSAs) (%) | 99.6 |
99.9 |
99.6 |
100 |
√ |
| Water quality | |||||
| Compliance with BWSA water quality requirements (%) |
|||||
| • Microbiological standards (E.coli) | 99.99 |
100 |
99.99 |
100 |
√ √ |
| • Disinfection by-products | 100 |
100 |
100 |
100 |
√ |
| • Aesthetics (turbidity) | 86.8 |
91.7.5 |
86.8 |
79.4* |
X |
| • Aesthetics (aluminium) | 99.9 |
98.2 |
99.9 |
99.75** |
X |
√ Target met √√ Target exceeded X Target not met
*Target was not achieved mainly due to high turbidity in the source water from Upper Yarra Reservoir caused by the June 2007 storm event.
**Target was not achieved due to two results from the Yan Yean supply to Whittlesea in which the pH stabilisation exceeded BWSA standards. Plant operations were reviewed and no reasons for the higher aluminium level were identified. However, the higher results could be connected with the shutdown of the plant, where a residual volume of water remains in the tank until the next time the reservoir starts up.
Sustainability Report 2006/07